HVAC takeoff software

Transcribe the equipment. Do not invent the tonnage.

This page is for mechanical contractors and GCs who bid equipment from Manual S and duct from the mechanical sheets. Brand, model, AFUE, SEER, and tonnage should be transcribed — not invented from a load-calc PDF that was only meant to confirm sizing. Ductwork is general unless the drawings support more.

Chip HVAC on upload. Load calcs (ACCA Manual J/S, CoolCalc) confirm HVAC sizing; they are not usually a quantity source to fabricate tons from. The trade-contractors page is the generic slice.

Solo at $200 is five successful takeoffs. Crew at $399 is fifteen and is featured (Most Popular: Full Bid Loop). Shop at $699 is forty. RFQs are on every plan. Failed runs do not count.

The problem

HVAC takeoffs fail when the model guesses a two-ton split because the floor area “looks like” two tons, when ERVs and generators are missed, and when duct is a lump with no page. A load calc sitting in the set is evidence for equipment selection, not a substitute for the mechanical schedule.

You still have to price equipment, mark SELF or SUB, and send a guest RFQ that does not include your unit prices.

Sunday-Off: still doing manual takeoffs on Sunday night after 30 days? Full refund.

What you get

Upload the PDF. Chip HVAC. ZIP. Run takeoff. Processing time varies with plan size and complexity. We email you.

Review equipment lines against Manual S and the mechanical sheets. Transcribe brand, model, AFUE, SEER. Treat duct as general unless you can cite better. Edit when the schedule wins. Then source, SELF or SUB, guest RFQ if you buy the install, apply without stacking, export.

See how it works. Then run your first bid. First-takeoff via feedback@takeoffspeed.io. Sunday-Off after 30 days. Cancel anytime. Failed runs do not count. We do not run your company. We help you get the bid out.

  1. Upload the plans.
  2. Review the takeoff and supporting evidence.
  3. Price self-performed materials.
  4. Send RFQs for subcontracted scope.
  5. Bring the returned quotes into the bid.
  6. Check coverage and avoid double-counting.
  7. Assemble and send the proposal.

In the product

HVAC takeoff grouped as its own trade: equipment and duct rows with page chips from the mechanical set, not a guessed tonnage.
HVAC takeoff grouped as its own trade: equipment and duct rows with page chips from the mechanical set, not a guessed tonnage.
Citation viewer opened from a page chip: the cited plan page beside the takeoff row, so a transcribed brand and model trace to a sheet.
Citation viewer opened from a page chip: the cited plan page beside the takeoff row, so a transcribed brand and model trace to a sheet.

What this supports

HVAC is a scope chip. Prompt: equipment tonnage from Manual S — transcribe exactly (brand, model, AFUE, SEER), ductwork general. Load calcs confirm sizing; they are not a quantity factory.

Citations, confidence, Needs your eyes. Line-item edit. Source FOUND versus BUDGETARY. Guest RFQs on every plan, quantities and units only, token page, fifteen recipients, due date required. Apply replace-covered-items or labor-only.

Browser-based. Solo $200 / 5, Crew $399 / 15 (featured), Shop $699 / 40. CSV and Word.

Sample output

/sample-bid is the golden tenant fit-out — ZIP 34420, $196,682.14 from computeBidTotals, including 10% additional contingency on material costs and 15% markup. HVAC is a real trade on that fixture. The project scope on the underlying set mentions two new split systems and an ERV; read the public table as that interior mechanical pass, not as a rooftop library.

We do not invent extra tons. Plan-page source is empty on the fixture’s takeoff lines; live takeoffs include available page references for review. Plumbing — not HVAC — is the applied quote on that page. CSV and Word stay disabled until you sign in.

What this does not do

No scheduling, no payroll, no change-order log. We do not run your company. We help you get the bid out.

A human reviews every line. We do not claim a complete Manual J. We do not invent tons from floor area. Duct is general. FOUND is not your distributor quote.

Your first subscription: one free takeoff in a 14-day trial. A credit card is required. Cancel before trial end to avoid billing. Refunds at feedback@takeoffspeed.io. Cancel anytime.

Questions

Should the takeoff invent equipment tons from floor area?
No. Transcribe Manual S: brand, model, AFUE, SEER, tonnage. Load calcs confirm sizing; they are not a quantity source to fabricate tons. If the sheet is missing, that row is no-evidence, not a guessed two-ton split.
How detailed is the duct takeoff?
The prompt calls ductwork general unless the drawings support more. Treat it as a first pass. Edit. Do not pretend every fitting was counted.
Can I RFQ the mechanical sub on Solo?
Yes. Guest RFQs are on every plan, including Solo at $200 for five successful takeoffs. Crew is $399 for fifteen and is featured. Shop is $699 for forty. Failed runs do not count.
Is the public sample an HVAC-applied bid?
No. HVAC lines are on the takeoff table. The applied quote on /sample-bid is Coastal Plumbing in replace mode. HVAC remains in the self-performed picture unless you apply a mechanical quote on a live job.

Run your first bid